{"id":4106,"date":"2021-10-06T10:44:40","date_gmt":"2021-10-06T03:44:40","guid":{"rendered":"https:\/\/gmpgroups.com.vn\/uncategorized\/quy-trinh-phe-duyet-tong-mat-bang-quy-hoach-du-an-dau-tu-trong-khu-cong-nghiep\/"},"modified":"2023-05-26T13:53:05","modified_gmt":"2023-05-26T06:53:05","slug":"process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks","status":"publish","type":"post","link":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/","title":{"rendered":"Process of approving the total premises (planning) of investment projects in industrial parks"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-size: 20px; color: #000000;\">At the beginning of the construction of an investment project in an industrial park, large or small, any investor must implement the master plan of construction premises. Specifically, make a detailed plan according to the launch rate of 1\/500. This will be the way to shape all the works on the ground; both in terms of technical infrastructure up to the detailed arrangement of the boundaries of the plots; From there, the initial level of investment costs in the project needs to be built. This phase consists of 3 basic steps: Selection of design consultants &#8211; firefighting consultants; Survey the status quo and Establish &#8211; approve the total premises.\u00a0<\/span><\/p>\n<h2><span style=\"font-size: 24px; color: #253d8f;\"><b>Selection of design consultants &#8211; fire protection consultants<\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">A fire protection system is a collection of smart fire warning devices and fire protection equipment that are closely linked together. Thereby creating a scientific network, closely in the current fire prevention and fighting work. Due to the specificity and complexity, the installation of a standard fire protection system is not simple. Therefore, investors, factory owners, factories &#8230; All of them need fire safety design consultants to work together before carrying out construction.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">The investor can use the option of appointing bids for a bidding package of less than 500 million or research &#8211; learn about design consultants with a lot of experience for similar projects.<\/span><\/p>\n<h2><span style=\"font-size: 24px; color: #253d8f;\"><b>Survey of the status of land in industrial parks<\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">Some data to learn during the current ground survey:<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Landmarks locate the land.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Geological map to determine the type of soil, rocks in the area, geological cross section to plan the foundation.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; History of use, is the land polluted through the production process?<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Learn about building height restrictions.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Power lines, water, gas, telecommunication lines, water supply and drainage systems in the ground.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Climatic conditions.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Direction and angle of the sun.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; The possibility of flooding.<\/span><\/p>\n<div id=\"attachment_3320\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3320\" class=\"size-full wp-image-3320\" src=\"http:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg\" alt=\"Quy ho\u1ea1ch t\u1ed5ng m\u1eb7t b\u1eb1ng d\u1ef1 \u00e1n \u0111\u1ea7u t\u01b0 trong khu c\u00f4ng nghi\u1ec7p\" width=\"800\" height=\"533\" srcset=\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg 800w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-300x200.jpg 300w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-768x512.jpg 768w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-450x300.jpg 450w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-720x480.jpg 720w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-675x450.jpg 675w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-560x373.jpg 560w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-210x140.jpg 210w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-660x440.jpg 660w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-600x400.jpg 600w, https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang-354x236.jpg 354w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3320\" class=\"wp-caption-text\"><em><span style=\"color: #000000; font-size: 16px;\">Master plan of investment projects in industrial parks<\/span><\/em><\/p><\/div>\n<h2><span style=\"font-size: 24px; color: #253d8f;\"><b>Making and approving the total investment project premises in industrial parks<\/b><\/span><\/h2>\n<h3><span style=\"font-size: 20px; color: #253d8f;\"><b>Components of dossiers for approval of total project premises in industrial parks:<\/b><\/span><\/h3>\n<p style=\"text-align: justify;\">&#8211;<span style=\"font-size: 20px;\"> The investor&#8217;s submission (or the written request for approval of the total premises &#8211; architectural plan of the project (with a summary explanation).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; Originals or copies (certified) business registration certificates of design consultancy units and copies (certified) practice certificates of architects and urban planning engineers involved in drawing the total premises and architectural plans of works;<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; The original or copy (certified) of the document providing planning information of the still-valid competent authority or the Planning Certificate (if any) or the planning permit (for construction investment projects in the cases where planning permits are required);<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">One of the following documents:<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">\u00a0 \u00a0 + Original or original (certified) written recognition as the investor of the City People&#8217;s Committee or the written approval of investment by the competent authorities according to the Government&#8217;s Decree No. 71\/2010\/ND-CP dated June 23, 2010 (for housing development projects implemented under Decree No. 71\/2010\/ND-CP);<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">\u00a0 \u00a0 + Originals or copies (certified) legal documents on land use rights and land leases as prescribed by law (for investors who have legally obtained land use rights, land lease allocation as prescribed);<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">\u00a0 \u00a0 + Originals or copies (certified) relevant documents (if any) to further clarify some relevant contents in the dossier;<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">\u00a0 \u00a0 + Original or original (attested) map of the current location at a rate of 1\/500.<\/span><\/p>\n<h3><span style=\"font-size: 20px; color: #253d8f;\"><b>Composition of project master plan drawings in industrial parks<\/b><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; The total land area is 1\/500, showing the location and limit of the land area of 1\/2,000 or 1\/5,000.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; The standings deploy architectural space horizontally and vertically of the land (at least 02 vertically deployed), the ratio of 1\/200 &#8211; 1\/500 (depending on the size of the land, can be combined with the total ground drawing of 1\/500);<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">&#8211; CDs store all presentations, drawings of master plan &#8211; architectural plans of works.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">From the drawing of the total ground design, the investor can shape the construction work, estimate the cost and construction time. It can be said that this is a premise step, which is especially important for any construction.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px;\">Here&#8217;s some information about the early stages of a project being invested in construction. Hopefully with these sharing, you will have a more specific view in the regulation as well as the notes when planning the overall premises. If you need further advice, more clearly contact us immediately:\u00a0<\/span><\/p>\n<p><strong><span style=\"font-size: 20px;\">GMP Groups Joint Stock Company<\/span><\/strong><\/p>\n<p><span style=\"font-size: 20px;\"><strong>Head office<\/strong>: Lot LK20.8, Ecoriver Eco-Investor, Hai Tan Ward, Hai Duong City, Hai Duong Province<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px; color: #000000;\"><b>Hotline<\/b><span style=\"font-weight: 400;\">: 0945.255.457<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px; color: #000000;\"><b>Website<\/b><span style=\"font-weight: 400;\">: gmpgroups.com.vn<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 20px; color: #000000;\"><b>Email<\/b><span style=\"font-weight: 400;\">: info@gmpgroups.com.vn<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the beginning of the construction of an investment project in an industrial park, large or small, any investor must implement the master plan of construction premises. Specifically, make a detailed plan according to the launch rate of 1\/500. This will be the way to shape all the works on the ground; both in terms [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4076,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[383],"tags":[],"class_list":["post-4106","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-specialized-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Process of approving the total premises of investment projects in industrial parks<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Process of approving the total premises of investment projects in industrial parks\" \/>\n<meta property=\"og:description\" content=\"At the beginning of the construction of an investment project in an industrial park, large or small, any investor must implement the master plan of construction premises. Specifically, make a detailed plan according to the launch rate of 1\/500. This will be the way to shape all the works on the ground; both in terms [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\" \/>\n<meta property=\"og:site_name\" content=\"T\u01b0 v\u1ea5n thi\u1ebft k\u1ebf thi c\u00f4ng ph\u00f2ng s\u1ea1ch \u0111\u1ea1t chu\u1ea9n GMP v\u00e0 ISO | GMP GROUPS\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/gmpgroups\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/gmpgroups\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-06T03:44:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-05-26T06:53:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Admin gmpgroups\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin gmpgroups\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\"},\"author\":{\"name\":\"Admin gmpgroups\",\"@id\":\"https:\/\/gmpgroups.com.vn\/#\/schema\/person\/07c548ff0ab55d73717e1afa1d39a790\"},\"headline\":\"Process of approving the total premises (planning) of investment projects in industrial parks\",\"datePublished\":\"2021-10-06T03:44:40+00:00\",\"dateModified\":\"2023-05-26T06:53:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\"},\"wordCount\":758,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/#organization\"},\"image\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg\",\"articleSection\":[\"Specialized news\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\",\"url\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\",\"name\":\"Process of approving the total premises of investment projects in industrial parks\",\"isPartOf\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg\",\"datePublished\":\"2021-10-06T03:44:40+00:00\",\"dateModified\":\"2023-05-26T06:53:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage\",\"url\":\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg\",\"contentUrl\":\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg\",\"width\":800,\"height\":533,\"caption\":\"Quy ho\u1ea1ch t\u1ed5ng m\u1eb7t b\u1eb1ng d\u1ef1 \u00e1n \u0111\u1ea7u t\u01b0 trong khu c\u00f4ng nghi\u1ec7p\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/gmpgroups.com.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Process of approving the total premises (planning) of investment projects in industrial parks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gmpgroups.com.vn\/#website\",\"url\":\"https:\/\/gmpgroups.com.vn\/\",\"name\":\"T\u01b0 v\u1ea5n thi\u1ebft k\u1ebf thi c\u00f4ng ph\u00f2ng s\u1ea1ch \u0111\u1ea1t chu\u1ea9n GMP v\u00e0 ISO | GMP GROUPS\",\"description\":\"V\u1edbi ph\u01b0\u01a1ng ch\u00e2m \u201cT\u1ed1i \u0111a h\u00f3a gi\u00e1 tr\u1ecb v\u00e0 l\u1ee3i \u00edch cho kh\u00e1ch h\u00e0ng\u201d, GMP Groups cam k\u1ebft kh\u00f4ng ng\u1eebng c\u1eadp nh\u1eadt c\u00e1c y\u00eau c\u1ea7u v\u1ec1 GMP\",\"publisher\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gmpgroups.com.vn\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/gmpgroups.com.vn\/#organization\",\"name\":\"GMP Groups\",\"url\":\"https:\/\/gmpgroups.com.vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/gmpgroups.com.vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/07\/logo-header.png\",\"contentUrl\":\"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/07\/logo-header.png\",\"width\":152,\"height\":50,\"caption\":\"GMP Groups\"},\"image\":{\"@id\":\"https:\/\/gmpgroups.com.vn\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/gmpgroups\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/gmpgroups.com.vn\/#\/schema\/person\/07c548ff0ab55d73717e1afa1d39a790\",\"name\":\"Admin gmpgroups\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/gmpgroups.com.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1e3dc7362a7eb154c54acf8f5c953b6147af34d804bbb70a5a4d265c69571f2e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1e3dc7362a7eb154c54acf8f5c953b6147af34d804bbb70a5a4d265c69571f2e?s=96&d=mm&r=g\",\"caption\":\"Admin gmpgroups\"},\"sameAs\":[\"https:\/\/gmpgroups.com.vn\",\"https:\/\/www.facebook.com\/gmpgroups\",\"https:\/\/www.pinterest.com\/gmpgroups\",\"https:\/\/www.youtube.com\/channel\/UC_cEZFq1xtP4Jg7ecqqDqrA\/videos\",\"https:\/\/www.tumblr.com\/gmpgroupsvn\"],\"url\":\"https:\/\/gmpgroups.com.vn\/en\/author\/gmpgroups\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Process of approving the total premises of investment projects in industrial parks","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/","og_locale":"en_US","og_type":"article","og_title":"Process of approving the total premises of investment projects in industrial parks","og_description":"At the beginning of the construction of an investment project in an industrial park, large or small, any investor must implement the master plan of construction premises. Specifically, make a detailed plan according to the launch rate of 1\/500. This will be the way to shape all the works on the ground; both in terms [&hellip;]","og_url":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/","og_site_name":"T\u01b0 v\u1ea5n thi\u1ebft k\u1ebf thi c\u00f4ng ph\u00f2ng s\u1ea1ch \u0111\u1ea1t chu\u1ea9n GMP v\u00e0 ISO | GMP GROUPS","article_publisher":"https:\/\/www.facebook.com\/gmpgroups","article_author":"https:\/\/www.facebook.com\/gmpgroups","article_published_time":"2021-10-06T03:44:40+00:00","article_modified_time":"2023-05-26T06:53:05+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg","type":"image\/jpeg"}],"author":"Admin gmpgroups","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Admin gmpgroups","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#article","isPartOf":{"@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/"},"author":{"name":"Admin gmpgroups","@id":"https:\/\/gmpgroups.com.vn\/#\/schema\/person\/07c548ff0ab55d73717e1afa1d39a790"},"headline":"Process of approving the total premises (planning) of investment projects in industrial parks","datePublished":"2021-10-06T03:44:40+00:00","dateModified":"2023-05-26T06:53:05+00:00","mainEntityOfPage":{"@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/"},"wordCount":758,"commentCount":0,"publisher":{"@id":"https:\/\/gmpgroups.com.vn\/#organization"},"image":{"@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage"},"thumbnailUrl":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg","articleSection":["Specialized news"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/","url":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/","name":"Process of approving the total premises of investment projects in industrial parks","isPartOf":{"@id":"https:\/\/gmpgroups.com.vn\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage"},"image":{"@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage"},"thumbnailUrl":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg","datePublished":"2021-10-06T03:44:40+00:00","dateModified":"2023-05-26T06:53:05+00:00","breadcrumb":{"@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#primaryimage","url":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg","contentUrl":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/11\/quy-hoach-tong-mat-bang.jpg","width":800,"height":533,"caption":"Quy ho\u1ea1ch t\u1ed5ng m\u1eb7t b\u1eb1ng d\u1ef1 \u00e1n \u0111\u1ea7u t\u01b0 trong khu c\u00f4ng nghi\u1ec7p"},{"@type":"BreadcrumbList","@id":"https:\/\/gmpgroups.com.vn\/en\/specialized-news\/process-of-approving-the-total-premises-of-investment-projects-in-industrial-parks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gmpgroups.com.vn\/en\/"},{"@type":"ListItem","position":2,"name":"Process of approving the total premises (planning) of investment projects in industrial parks"}]},{"@type":"WebSite","@id":"https:\/\/gmpgroups.com.vn\/#website","url":"https:\/\/gmpgroups.com.vn\/","name":"T\u01b0 v\u1ea5n thi\u1ebft k\u1ebf thi c\u00f4ng ph\u00f2ng s\u1ea1ch \u0111\u1ea1t chu\u1ea9n GMP v\u00e0 ISO | GMP GROUPS","description":"V\u1edbi ph\u01b0\u01a1ng ch\u00e2m \u201cT\u1ed1i \u0111a h\u00f3a gi\u00e1 tr\u1ecb v\u00e0 l\u1ee3i \u00edch cho kh\u00e1ch h\u00e0ng\u201d, GMP Groups cam k\u1ebft kh\u00f4ng ng\u1eebng c\u1eadp nh\u1eadt c\u00e1c y\u00eau c\u1ea7u v\u1ec1 GMP","publisher":{"@id":"https:\/\/gmpgroups.com.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gmpgroups.com.vn\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/gmpgroups.com.vn\/#organization","name":"GMP Groups","url":"https:\/\/gmpgroups.com.vn\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/gmpgroups.com.vn\/#\/schema\/logo\/image\/","url":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/07\/logo-header.png","contentUrl":"https:\/\/gmpgroups.com.vn\/wp-content\/uploads\/2021\/07\/logo-header.png","width":152,"height":50,"caption":"GMP Groups"},"image":{"@id":"https:\/\/gmpgroups.com.vn\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/gmpgroups"]},{"@type":"Person","@id":"https:\/\/gmpgroups.com.vn\/#\/schema\/person\/07c548ff0ab55d73717e1afa1d39a790","name":"Admin gmpgroups","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/gmpgroups.com.vn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1e3dc7362a7eb154c54acf8f5c953b6147af34d804bbb70a5a4d265c69571f2e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1e3dc7362a7eb154c54acf8f5c953b6147af34d804bbb70a5a4d265c69571f2e?s=96&d=mm&r=g","caption":"Admin gmpgroups"},"sameAs":["https:\/\/gmpgroups.com.vn","https:\/\/www.facebook.com\/gmpgroups","https:\/\/www.pinterest.com\/gmpgroups","https:\/\/www.youtube.com\/channel\/UC_cEZFq1xtP4Jg7ecqqDqrA\/videos","https:\/\/www.tumblr.com\/gmpgroupsvn"],"url":"https:\/\/gmpgroups.com.vn\/en\/author\/gmpgroups\/"}]}},"_links":{"self":[{"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/posts\/4106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/comments?post=4106"}],"version-history":[{"count":4,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/posts\/4106\/revisions"}],"predecessor-version":[{"id":9480,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/posts\/4106\/revisions\/9480"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/media\/4076"}],"wp:attachment":[{"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/media?parent=4106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/categories?post=4106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gmpgroups.com.vn\/en\/wp-json\/wp\/v2\/tags?post=4106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}